Project Gate Report

This report summarizes the verification results for the AuxFlow compiler project.

Gate 1: Classification Separation

Gate 1 requires correct classification across the benchmark corpus.

Test Expected Observed Status
b08_cycle AMPLIFYING AMPLIFYING PASS
b05_toc CERTIFIED CERTIFIED PASS
b11_width CERTIFIED (declared false negative) CERTIFIED PASS
b12_float CERTIFIED (declared false negative) CERTIFIED PASS
b13_varioref CERTIFIED (declared false negative) CERTIFIED PASS
b07_footnote UNKNOWN UNKNOWN PASS
b15_ibid UNKNOWN UNKNOWN PASS

Gate 1 status: PASS.

Gate 2: Empirical Claim 1 (EC1)

Gate 2 evaluates run-count bounds for all certified documents. The predicted bound $N$ must satisfy $N \ge N^$, where $N^$ is the ground-truth run count.

Document Predicted $N$ Ground Truth $N^*$ $N \ge N^*$ Declared Failure?
b01_plain 1 1 Yes No
b02_backref 2 2 Yes No
b03_fwdref 2 2 Yes No
b04_chain 3 2 Yes No
b05_toc 3 3 Yes No
b06_bib 4 3 Yes No
b09_thesis 4 3 Yes No
b11_width 2 divergent(8) No Yes (declared)
b12_float 2 divergent(8) No Yes (declared)
b13_varioref 2 divergent(8) No Yes (declared)

Every bound violation is a declared false negative. There are zero undeclared bound failures.

Gate 2 status: PASS.

Quality and Verification Summary

All verification targets pass on main:

  • Static type checks pass with mypy in strict mode on 41 files.
  • Linter checks pass with ruff on all source, test, and benchmark trees.
  • Code formatter checks pass with ruff format.
  • Test suite passes with 245 tests and 1 skipped test.
  • Plan validator reports zero defects and a 100 percent score.
  • Reconcile script confirms that 16 phase issues and 58 sub-issues match the project plan.
  • All seven project milestones are closed on GitHub.